Bill a project in stages

Copy for AI
Use AI with help

On a long job paid only at the end, you fund the materials and wages yourself. Billing in stages, such as 30% at signing, 40% halfway and 30% at handover, brings cash in as the work moves. A billing plan on the quotation sets the stages once.

  1. Finalise the quotation, then select Set up billing plan on its Billing plan card.
  2. Keep the Plan type at Milestones. Fill in the first stage, then select Add stage for each of the others. Give each a Stage name, a percentage and a Planned date: 30, 40 and 30.
  3. Select Save plan. The three claims make up 100% of the contract sum, so the card shows no warning.
  4. When a stage’s Status reads Due, select Create invoice on its row, then Create invoice in the dialog. Check the draft and issue it.
  • Every quotation line, scaled to the stage’s share, headed by the stage name and quotation number, such as “Carpentry done — QN-10000150”. For a shorter invoice, choose One line per tax rate in the dialog and the product to bill.
  • On the invoice page, a Staged invoicing card with the billing summary.
  • On the PDF, a line naming the stage, such as “Progress claim 2 of 3 — Carpentry done · QN-10000150”, and a billing summary: the contract sum, what was claimed before, this claim, and the total claimed so far with its percentage. The summary is for information; it is not part of the amount payable.

With a plan, the quotation PDF prints the payment schedule, so the customer agrees to the stages with the offer and expects each invoice when it arrives. The plan’s card shows which stage is due, drafted or invoiced, so none is forgotten.

Lim & Co quotes Harbour Café SGD 20,000.00 before tax, at GST 9%, for a renovation.

Stage Share Before tax GST 9% Café pays
Signing 30% 6,000.00 540.00 6,540.00
Carpentry done 40% 8,000.00 720.00 8,720.00
Handover 30% 6,000.00 540.00 6,540.00

The café pays SGD 21,800.00 in all, which is 20,000.00 plus 9% GST. The second invoice’s summary shows 6,000.00 claimed before, 8,000.00 this claim and 14,000.00 claimed so far (70%).

  • Should the first 30% be a Deposit stage? It can be. A Deposit stage sits beside the claims and is deducted later, so the claims must still make up 100%. For 30/40/30, enter Deposit 30%, then milestones of 40% and 60%, with the deposit deducted on the final claim: the last invoice is 60% less the 30% deposit, which is 30%.
  • Can I move a stage’s date when the work runs late? Yes, with Edit plan. An invoiced stage keeps its figure, but its name and date can still change.
  • What if the customer drops the last stage? Select Skip on its row. It leaves the plan’s total, and Undo skip brings it back.